NAME OF CLIENT: Bunge
CONTRACT YEAR: 2022
LOCATION: İzmir/Turkey
PROJECT DESCRIPTION: The new boiler to be established in the existing Izmir Extraction crush plant located at Bozköy/Izmir/Turkey with capacity 20t/h of saturated steam with pressure 12 barg. Biomass (sunflower hulls, olive pomace and wood chips) and local coal is planned to use in the new boiler. This new boiler will be built into an existing site, which is near the existing coal storage.
Battery limits are given below;
SERVICES:
.
NAME OF CLIENT: CNIM
CONTRACT YEAR: 2021
LOCATION: Bolton/England
PROJECT DESCRIPTION: After Lostock WtE Plant's start-up, which is scheduled for 2023, the plant will combust approx. 600,000 t of RDF (refuse derived fuel) of household and commercial waste per year. The heat released (2 x 120 MW) will be used to generate electricity (90 MW) and to provide heat and process steam to the neighbouring industrial premises.
SERVICES:
Review of architectural design
NAME OF CLIENT: CNIM
CONTRACT YEAR: 2020
LOCATION: Belgrade/Serbia
PROJECT DESCRIPTION: The energy-from-waste facility will produce up to 30 MW of electricity, plus 56 MW of heat purchased by the municipal company Beogradske Elektrane, reducing the natural gas consumption of its Konjarnik plant by 80% in the cold season.
SERVICES:
NAME OF CLIENT: Polyak Eynez Power Generation Mining Ind. & Trade Inc.
CONTRACT YEAR: 2018
LOCATION: Soma/Manisa/Turkey
PROJECT DESCRIPTION: The plant will produce power using the local lignite resource of Client's own. The plant is composed of 2X350 MW fludized bed boliler, turbine, generator and BOP .
SERVICES:
NAME OF CLIENT Harbin Electric International Company
CONTRACT YEAR 2017-2018
LOCATION Dubai/B.A.E.
PROJECT DESCRIPTION The 2,400MW Hassyan clean coal power station is an ultra-supercritical (USC) power plant being developed in Saih Shuaib, Dubai, United Arab Emirates. Upon completion, the project is set to be the first coal-based power plant in the region. The USC technology enables the power plant to run at a higher steam temperature and pressure than traditional coal-fired plants,improving the plant efficiency and decreasing stack-emissions. The project also features a carbon capture-ready design. PROMER executed the design in its scope according to American specifications.
SERVICES
NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.
CONTRACT YEAR 2016
LOCATION Kazan/Russian Federation
PROJECT DESCRIPTION The plant consists of 1 GE 9HA 01 gas turbine, 1 GE H28.56 Generator, 1 double pressure HRSG, as well as all balance of plant equipment
SERVICES
NAME OF CLIENT Sinosteel Corporation
CONTRACT YEAR 2016
LOCATION Adıyaman/Turkey
PROJECT DESCRIPTION The plant will produce power using the local lignite resource of Client's own. The plant which is composed of a unit of 150 MW fludized bed boliler, turbine, generator and BOP swill generate 1 billion 80 million kWh electricity. The total investment amount of the plant is approximately 250 million USD.
SERVICES
NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.
CONTRACT YEAR 2015
LOCATION Khabat / Iraq
PROJECT DESCRIPTION The project consists of 2 x 150 MW thermal power plant with 2 Fuel Oil/Diesel Fuel Oil Boiler and 2 Steam Turbine & Generator sets.
With its completion the plant generates energy around 1,600 GWh per year which has a significant contribution to energy production in Iraq.
SERVICES
NAME OF CLIENT State Nuclear Electric Power Planning Design & Research Institute (SNPDRI)
CONTRACT YEAR 2014-2017
LOCATION Soma/Manisa/Turkey
PROJECT DESCRIPTIONThe plant will consist of two 255MW units using domestic lignite coal from the nearby coal fields for generating power to be fed to the national grid. The plant is expected to operate for approximately 6,000 hours a year to produce 2.7billion KWh of electricity for residential use. The thermal power plant will feature two circulating fluidised-bed (CFB) boiler islands and flue gas scrubbers.
The CFB boilers will be deigned to burn local lignite operating at low combustion temperatures resulting in low nitrogen oxide and sulphur oxide emissions and high combustion efficiency.
The Siemens SST5-5000 HM-N model steam turbines to be installed at the plant will produce steam at a pressure ranging from 177bar to 190bar and temperature ranging from 565°C to 600°C.
Electrostatic precipitator with fly and bottom ash hoppers will be installed to capture the fly ash produced during the power generation.
SERVICES
NAME OF CLIENT Eren Energy Electricity Generation Inc.
CONTRACT YEAR 2013-2015
LOCATION Çatalağzı/ Zonguldak/ Turkey
PROJECT DESCRIPTION ZETES III 2X660MW Supercritical Thermal Power Plant is a key Project of EREN, located near to the Black Sea with the project duration lasting for 33 months. The boiler in this unit is a supercritical and uses pulverized imported coal.
SERVICES
NAME OF CLIENT Vitkovice Power Engineering a.s.
CONTRACT YEAR 2012-2013
LOCATION Mihaliccik/ Eskisehir/ Turkey
PROJECT DESCRIPTION Fluidized Bed Yunus Emre Thermal Power Plant (2X145 MW), using lignite coal as a fuel, is the first power plant in Turkey, which the European and Kyoto emission criteria. It is the first private sector investment project in which the Mining and Thermal Power Plant is technologically planned simultaneously. The design was carried out according to Eurocode and Turkish Standards.
SERVICES
NAME OF CLIENT İzdemir Electricity Generation Inc.
CONTRACT YEAR 2011-2012
LOCATION Aliaga/ Izmir/ Turkey
PROJECT DESCRIPTION The investor of the power plant with a capacity of 1x350 MW is İzdemir Enerji Elektrik Üretim A.Ş.
The plant is a coal fired super critical power plant. Electrostatic precipitator is erected in the plant. The dust emission is less than 10 mg/m3 which is much less than EU allowable value 30 mg/m3.
SERVICES
NAME OF CLIENT CSEPDI-Central Southern China Electrical Power Design Institute
CONTRACT YEAR 2011-2013
LOCATION Iskenderun/Hatay/ Turkey
PROJECT DESCRIPTION Atlas Enerji Üretim A.Ş. obtained from the EMRA (Energy Market Regulatory Authority) a power generation license for 2 x 600 MW Coal Fuel Thermal Power Plant Project in Iskenderun. The company is planning to establish natural gas, wind and geothermal power plants on the long run.
2 x 600 MW Thermal Power Plant Project has been completed in two stages. In the phase 1, the two units and shared facilities of the two units (i.e. chimney, turbine-generator building, water treatment facility building, cooling with seawater construction works, coal storage room have been constructed. The two units will generate 8.500.000 kWh per year.
SERVICES
NAME OF CLIENT Hyundai Heavy Industries Co. Ltd.
CONTRACT YEAR 2011-2012
LOCATION Tufanbeyli/ Adana/ Turkey
PROJECT DESCRIPTION Tufanbeyli Lignite Power Plant Project is located in Tufanbeyli town, Adana Province. The technology of the project is Fluidized-bed drying which depends on lignite coal. After taking into operation, Tufanbeyli Lignite Power Plant is planned to have 450 MW installed capacity.
SERVICES
NAME OF CLIENT Central Southern China Electrical Power Design Institute
CONTRACT YEAR 2010-2012
LOCATION Biga/ Canakkale/ Turkey
PROJECT DESCRIPTION The owner of the plant is İçdaş Steel Energy Shipyard and Transportation Industry Inc. Power plant is constructed at +15 m elevation within the boundaries of Bekirli-Kemer, which is 30 km away from the Biga town of Canakkale province.
Power plant is equipped with highly efficient super critical boiler/turbine, and from environmental aspects, with DESOX (Flue Gas Desulphurization) and DENOX (Denitrification) units.
The power plant is named supercritical due to its operation above critical pressure and temperature (22.12 MPa, 374 °C). Operation in the region of supercritical steam values ensures more economical energy due to higher thermal efficiency, and cleaner energy production with the flue gas purification units.
SERVICES
NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.
CONTRACT YEAR 2008-2010
LOCATION Sirt/Libya
PROJECT DESCRIPTION The investor of the project is GECOL (Libyan Official Electricity Generation Company) and the consultant is Bechtel International Inc. This power plant is located 20 km west of Sirte, Libya and consists of four 350 megawatt Rankine cycle units designed to fire natural gas, heavy fuel oil, and light fuel oil and in any combination.The power island consists of four tangentially-fired Doosan boilers with low-NOx burners, four reheat Hitachi steam turbines; and once-through seawater cooled condensers.Included are a 1 km offshore seawater intake, a 2 km single-point offshore mooring for fuel oil unloading, fuel oil storage tanks, and multi-effect desalination units.
SERVICES
NAME OF CLIENT Kalemci Construction Industry and Trade Inc.
CONTRACT YEAR 2008-2010
LOCATION Bandirma/ Balikesir/ Turkey
PROJECT DESCRIPTION Enerjisa Energy Production Co. and the main contractor is the A_TEC / MHI Consortium. Combined cycle power plant has two gas turbines with each capacity of 304,29 MW, two heat recovery steam generator which have 500 tons/hour steam capacity and one steam turbine with a capacity of 327,6 MW. The power plant is positioned close to the Marmara Sea and sea water, with the amount of 54.000 m3/hour, is used for cooling.
SERVICES
NAME OF CLIENT CSEPDI-Central Southern China Electrical Power Design Institute
CONTRACT YEAR 2007-2008
LOCATION Biga/ Canakkale/ Turkey
PROJECT DESCRIPTION The capacity of the power plant is 2X135 MW. The owner of the plant is İçdaş Steel Energy Shipyard and Transportation Industry Inc. In the power plant; fluidized-bed combustion technology is used, which is a clean coal technology. Coal is used as the main fuel and natural gas as auxiliary fuel in our plant. Coal is transferred from the stock area into the boiler through an enclosed conveyer belt system. Coal is burned inside the fluidized bed boiler with the addition of limestone. The gases emitted as a result of combustion pass through the electrostatic dust-holding filters and then directed to the chimney as dust-free. Besides achieving better coal burning with the fluidized bed combustion technology, the SO2 and NOx emissions remain below the desired limits in terms of environmental requirements due to the added limestone and the low burning temperature respectively.
SERVICES