POWER PLANTS

Biomass Hybrid Boiler

.

Biomass Hybrid Boiler.

NAME OF CLIENT: Bunge  

CONTRACT YEAR: 2022
LOCATION: İzmir/Turkey

PROJECT DESCRIPTION: The new boiler to be established in the existing Izmir Extraction crush plant located at Bozköy/Izmir/Turkey with capacity 20t/h of saturated steam with pressure 12 barg. Biomass (sunflower hulls, olive pomace and wood chips) and local coal is planned to use in the new boiler. This new boiler will be built into an existing site, which is near the existing coal storage.

Battery limits are given below;

  • New steam boiler (biomass and coal flues), capacity: 20 mt steam/h, steam pressure: 12 barg
  • New building for the boiler
  • Landscaping works inside battery limits
  • High efficient condensate return system
  • Fuel intake and storage area
  • Ash collecting and unloading area
  • Automation & SCADA programming
  • Demolition of existing coal boiler

SERVICES: 

  • Process design of the system
  • R/C and steel structures design
  • Architectural design
  • Mechanic equipment design
  • Electrical and automation design
  • BoQ and cost estimate
  • Technical specification

Lostock Waste to Energy Project

.

Lostock Waste to Energy Project.

NAME OF CLIENT: CNIM    

CONTRACT YEAR: 2021
LOCATION: Bolton/England

PROJECT DESCRIPTION: After Lostock WtE Plant's start-up, which is scheduled for 2023, the plant will combust approx. 600,000 t of RDF (refuse derived fuel) of household and commercial waste per year. The heat released (2 x 120 MW) will be used to generate electricity (90 MW) and to provide heat and process steam to the neighbouring industrial premises.

SERVICES: 

  • Review of reinforced concrete and steel structures design

Review of architectural design

Belgrade Waste to Energy Project

Belgrade Waste to Energy Project

NAME OF CLIENT: CNIM

CONTRACT YEAR: 2020
LOCATION: Belgrade/Serbia

PROJECT DESCRIPTION: The energy-from-waste facility will produce up to 30 MW of electricity, plus 56 MW of heat purchased by the municipal company Beogradske Elektrane, reducing the natural gas consumption of its Konjarnik plant by 80% in the cold season.

SERVICES: 

  • Review of reinforced concrete and steel structures design
  • Review of architectural design

Polyak 2X350 MW Thermal Power Plant

Polyak 2X350 MW Thermal Power Plant

NAME OF CLIENT: Polyak Eynez Power Generation Mining Ind. & Trade Inc.

CONTRACT YEAR: 2018
LOCATION: Soma/Manisa/Turkey

PROJECT DESCRIPTION: The plant will produce power using the local lignite resource of Client's own. The plant is composed of 2X350 MW fludized bed boliler, turbine, generator and BOP . 

SERVICES: 

  • Permit Design Documentation

Dubai Hassyan 4X600 MW Clean Coal Power Plant

Dubai Hassyan 4X600 MW Clean Coal Power Plant

NAME OF CLIENT Harbin Electric International Company

CONTRACT YEAR 2017-2018
LOCATION Dubai/B.A.E.

PROJECT DESCRIPTION The 2,400MW Hassyan clean coal power station is an ultra-supercritical (USC) power plant being developed in Saih Shuaib, Dubai, United Arab Emirates. Upon completion, the project is set to be the first coal-based power plant in the region. The USC technology enables the power plant to run at a higher steam temperature and pressure than traditional coal-fired plants,improving the plant efficiency and decreasing stack-emissions. The project also features a carbon capture-ready design. PROMER executed the design in its scope according to American specifications.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric installation design)
  • Material take-off studies

Kazanskaya 390 MW Combined Heat and Power Plant

Kazanskaya 390 MW Combined Heat and Power Plant

NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.

CONTRACT YEAR 2016
LOCATION Kazan/Russian Federation

PROJECT DESCRIPTION The plant consists of 1 GE 9HA 01 gas turbine, 1 GE H28.56 Generator, 1 double pressure HRSG, as well as all balance of plant equipment  

SERVICES

  • AVEVA 3-D smart modelling coordination
  • Detail design (Steel and reinforced concrete structure, electical, piping design)
  • Material take-off studies

Sanko Golbasi 150 MW Power Plant

Sanko Golbasi 150 MW Power Plant

NAME OF CLIENT Sinosteel Corporation

CONTRACT YEAR 2016
LOCATION Adıyaman/Turkey

PROJECT DESCRIPTION The plant will produce power using the local lignite resource of Client's own. The plant which is composed of a unit of 150 MW fludized bed boliler, turbine, generator and BOP swill generate 1 billion 80 million kWh electricity. The total investment amount of the plant is approximately 250 million USD.

SERVICES

  • Permit Design Documentation

Khabat 2X150 MW Thermal Power Plant

Khabat 2X150 MW Thermal Power Plant

NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.

CONTRACT YEAR 2015
LOCATION Khabat / Iraq

PROJECT DESCRIPTION The project consists of 2 x 150 MW thermal power plant with 2 Fuel Oil/Diesel Fuel Oil Boiler and 2 Steam Turbine & Generator sets.
With its completion the plant generates energy around 1,600 GWh per year which has a significant contribution to energy production in Iraq.  

SERVICES

  • AVEVA 3-D smart modelling coordination
  • Detail design (Steel and reinforced concrete structure, electical, piping design)
  • Heat tracing design
  • Material take-off studies

SOMA 2 X225 MW Coal Fired Power Plant

SOMA 2 X225 MW Coal Fired Power Plant

NAME OF CLIENT State Nuclear Electric Power Planning Design & Research Institute (SNPDRI)

CONTRACT YEAR 2014-2017
LOCATION Soma/Manisa/Turkey

PROJECT DESCRIPTIONThe plant will consist of two 255MW units using domestic lignite coal from the nearby coal fields for generating power to be fed to the national grid. The plant is expected to operate for approximately 6,000 hours a year to produce 2.7billion KWh of electricity for residential use. The thermal power plant will feature two circulating fluidised-bed (CFB) boiler islands and flue gas scrubbers.
The CFB boilers will be deigned to burn local lignite operating at low combustion temperatures resulting in low nitrogen oxide and sulphur oxide emissions and high combustion efficiency.
The Siemens SST5-5000 HM-N model steam turbines to be installed at the plant will produce steam at a pressure ranging from 177bar to 190bar and temperature ranging from 565°C to 600°C.
Electrostatic precipitator with fly and bottom ash hoppers will be installed to capture the fly ash produced during the power generation.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric installation ,geotechnical and infrastructure design)
  • Fire security and fire fighting design
  • Material take-off studies

ZETES III 2x660 MW Power Plant

ZETES III 2x660 MW Power Plant

NAME OF CLIENT Eren Energy Electricity Generation Inc.

CONTRACT YEAR 2013-2015
LOCATION Çatalağzı/ Zonguldak/ Turkey

PROJECT DESCRIPTION ZETES III 2X660MW Supercritical Thermal Power Plant is a key Project of EREN,  located near to the Black Sea with the project duration lasting for 33 months. The boiler in this unit is a supercritical and uses pulverized imported coal. 

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure)
  • Material take-off studies

Yunus Emre 2X145 MW Power Plant

Yunus Emre 2X145 MW Power Plant

NAME OF CLIENT Vitkovice Power Engineering a.s. 

CONTRACT YEAR 2012-2013
LOCATION Mihaliccik/ Eskisehir/ Turkey

PROJECT DESCRIPTION Fluidized Bed Yunus Emre Thermal Power Plant (2X145 MW), using lignite coal as a fuel, is the first power plant in Turkey, which the European and Kyoto emission criteria. It is the first private sector investment project in which the Mining and Thermal Power Plant is technologically planned simultaneously. The design was carried out according to Eurocode and Turkish Standards. 

SERVICES

  • AVEVA 3-D smart modelling
  • Detail design (Architecture, steel and reinforced concrete structure, electric and mechanical installation and equipment, piping, infrastructure, geotechnical design)
  • HAZOP study
  • Material Take of Studies

İzdemir 1X350 MW Thermal Power Plant

İzdemir 1X350 MW Thermal Power Plant

NAME OF CLIENT İzdemir Electricity Generation Inc.

CONTRACT YEAR 2011-2012
LOCATION Aliaga/ Izmir/ Turkey

PROJECT DESCRIPTION The investor of the power plant with a capacity of 1x350 MW is İzdemir Enerji Elektrik Üretim A.Ş. 
The plant is a coal fired super critical power plant. Electrostatic precipitator is erected in the plant. The dust emission is less than 10 mg/m3 which is much less than EU allowable value 30 mg/m3.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric and mechanical installation , infrastructure design)
  • Material Take of Studies

Atlas (1+1) X 600 MW İskenderun Thermal Power Plant

Atlas (1+1) X 600 MW İskenderun Thermal Power Plant

NAME OF CLIENT CSEPDI-Central Southern China Electrical Power Design Institute

CONTRACT YEAR 2011-2013
LOCATION Iskenderun/Hatay/ Turkey

PROJECT DESCRIPTION Atlas Enerji Üretim A.Ş. obtained from the EMRA (Energy Market Regulatory Authority) a power generation license for 2 x 600 MW Coal Fuel Thermal Power Plant Project in Iskenderun. The company is planning to establish natural gas, wind and geothermal power plants on the long run.
2 x 600 MW Thermal Power Plant Project has been completed in two stages. In the phase 1, the two units and shared facilities of the two units (i.e. chimney, turbine-generator building, water treatment facility building, cooling with seawater construction works, coal storage room have been constructed. The two units will generate 8.500.000 kWh per year.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure design)
  • Structural Design Review
  • Material Take of Studies

Tufanbeyli 450 MW Power Plant

Tufanbeyli 450 MW Power Plant

NAME OF CLIENT Hyundai Heavy Industries Co. Ltd.

CONTRACT YEAR 2011-2012
LOCATION Tufanbeyli/ Adana/ Turkey

PROJECT DESCRIPTION Tufanbeyli Lignite Power Plant Project is located in Tufanbeyli town, Adana Province. The technology of the project is Fluidized-bed drying which depends on lignite coal. After taking into operation, Tufanbeyli Lignite Power Plant is planned to have 450 MW installed capacity.

SERVICES

  • Structural Design Review

Bekirli 2X600 MW Supercritical Thermal Power Plant

Bekirli 2X600 MW Supercritical Thermal Power Plant

NAME OF CLIENT Central Southern China Electrical Power Design Institute

CONTRACT YEAR 2010-2012
LOCATION Biga/ Canakkale/ Turkey

PROJECT DESCRIPTION The owner of the plant is İçdaş Steel Energy Shipyard and Transportation Industry Inc.  Power plant is constructed at +15 m elevation within the boundaries of Bekirli-Kemer, which is 30 km away from the Biga town of Canakkale province. 
Power plant is equipped with highly efficient super critical boiler/turbine, and from environmental aspects, with DESOX (Flue Gas Desulphurization) and DENOX (Denitrification) units. 
The power plant is named supercritical due to its operation above critical pressure and temperature (22.12 MPa, 374 °C). Operation in the region of supercritical steam values ensures more economical energy due to higher thermal efficiency, and cleaner energy production with the flue gas purification units.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric installation design, geotechnical and infrastructure design)
  • Material take-off studies                                                                                                    
  • Connection and inland road design

Al Khalij 4X350 MW Power Plant

Al Khalij 4X350 MW Power Plant

NAME OF CLIENT Gama Industrial Plants Manufacturing and Erection Inc.

CONTRACT YEAR 2008-2010
LOCATION Sirt/Libya

PROJECT DESCRIPTION The investor of the project is GECOL (Libyan Official Electricity Generation Company) and the consultant is Bechtel International Inc. This power plant is located 20 km west of Sirte, Libya and consists of four 350 megawatt Rankine cycle units designed to fire natural gas, heavy fuel oil, and light fuel oil and in any combination.The power island consists of four tangentially-fired Doosan boilers with low-NOx burners, four reheat Hitachi steam turbines; and once-through seawater cooled condensers.Included are a 1 km offshore seawater intake, a 2 km single-point offshore mooring for fuel oil unloading, fuel oil storage tanks, and multi-effect desalination units.

SERVICES

  • PDMS (AVEVA) 3-D smart modelling
  • Detail design (Architecture, steel and reinforced concrete, geotechnical design)
  • Material Take of Studies

Bandırma 919 MW Combined Natural Gas Power Plant

Bandırma 919 MW Combined Natural Gas Power Plant

NAME OF CLIENT Kalemci Construction Industry and Trade Inc.

CONTRACT YEAR 2008-2010
LOCATION Bandirma/ Balikesir/ Turkey

PROJECT DESCRIPTION Enerjisa Energy Production Co. and the main contractor is the A_TEC / MHI Consortium.  Combined cycle power plant has two gas turbines with each capacity of 304,29 MW, two heat recovery steam generator which have 500 tons/hour steam capacity and one steam turbine with a capacity of 327,6 MW. The power plant is positioned close to the Marmara Sea and sea water, with the amount of 54.000 m3/hour, is used for cooling.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric installation design, geotechnical and infrastructure design)
  • Fire security and fire fighting design
  • Material take-off studies                                                                                                    
  • Connection and inland road design

Biga 2X135 MW Thermal Power Plant

Biga 2X135 MW Thermal Power Plant

NAME OF CLIENT CSEPDI-Central Southern China Electrical Power Design Institute

CONTRACT YEAR 2007-2008
LOCATION Biga/ Canakkale/ Turkey

PROJECT DESCRIPTION The capacity of the power plant is 2X135 MW. The owner of the plant is İçdaş Steel Energy Shipyard and Transportation Industry Inc. In the power plant; fluidized-bed combustion technology is used, which is a clean coal technology. Coal is used as the main fuel and natural gas as auxiliary fuel in our plant. Coal is transferred from the stock area into the boiler through an enclosed conveyer belt system. Coal is burned inside the fluidized bed boiler with the addition of limestone. The gases emitted as a result of combustion pass through the electrostatic dust-holding filters and then directed to the chimney as dust-free. Besides achieving better coal burning with the fluidized bed combustion technology, the SO2 and NOx emissions remain below the desired limits in terms of environmental requirements due to the added limestone and the low burning temperature respectively.

SERVICES

  • Detail design (Architecture, steel and reinforced concrete structure, electric installation design, geotechnical and infrastructure design)
  • Material take-off studies                                                                                                    
  • Connection and inland road design